Built for operators on the job site. Fast, accurate, works on your phone.
Cubic yards, truck loads, swell factor, material weight.
Cut slope width from depth and ratio. Total top width.
Grade from rise/run, or find rise or run from a known grade.
Excavation volume, spoil, pipe volume deduction.
Convert between bank, loose, and compacted measure.
Cone, windrow, and flat-top pile volume and weight.
Cycle time, loads per day, daily production, days to finish.
How many trucks to keep your excavator or shovel fully loaded.
Days to complete based on machine rate, efficiency, and schedule.
Number of lifts and passes to reach required depth and spec.
Excavation + haul + fill + contingency = total job cost.
Road fills, dam fills. Trapezoidal cross-section with side slopes.
Volume, tons, truck loads for reclamation and landscaping.
Gravel base course volume and tons for roads and haul roads.
Bedding and haunching material volume for any pipe diameter.
Cat D3 to D11. Push distance, slope, material factors.
Studying for the IUOE, Red Seal, or NCCER exam?
Get the complete study guide at dirtschool.ca โ